MediaCabin HelpOpen MediaCabin

Production settings

Leads click the production's name at the top of the sidebar, then the gear at the bottom of the menu.

General

  1. Change the name or the client.
  2. Click the thumbnail, pick another design.
  3. Choose the Time zone where the production happens. Type in the list to find a city. Every time in the production, the clock and now-lines included, uses it.
  4. Click Save.

Days

  1. Click Pick a date and choose a day to add it.
  2. Choose what each day is: pre-production, preparation, load-in, show day, load-out, travel or day off.
  3. Click the bin to remove a day.

The first and last day show on Home. The Lineup and the Planning work per day.