Production settings
Leads click the production's name at the top of the sidebar, then the gear at the bottom of the menu.
General
- Change the name or the client.
- Click the thumbnail, pick another design.
- Choose the Time zone where the production happens. Type in the list to find a city. Every time in the production, the clock and now-lines included, uses it.
- Click Save.
Days
- Click Pick a date and choose a day to add it.
- Choose what each day is: pre-production, preparation, load-in, show day, load-out, travel or day off.
- Click the bin to remove a day.
The first and last day show on Home. The Lineup and the Planning work per day.
MediaCabin Help